1. Before entering the site, it is necessary to do a good job in the teaching and assessment of construction safety and fire safety related knowledge. Employees who fail the assessment should be prohibited from entering the site.
2. Strictly implement the safety operation process, do not violate the regulations and instructions and work in violation of the regulations, and have the right to reject the instructions that violate the regulations and have the obligation to discourage others from violating regulations.
3. During the installation of the tower clock, operating technicians need to wear personal protective equipment rationally, and they must wear safety helmets when entering the construction site. Do not use fire at will, and drunken manipulation is strictly prohibited.
4. The technicians who carry out high-altitude operations must experience on time. Those who suffer from high blood pressure, heart disease, anemia, epilepsy, or who are not suitable for high-altitude operations are not allowed to carry out high-altitude operations.
5. When working on high places, building steel bars, and connecting structures, you must wear non-slip shoes.
6. On-site power distribution must be managed and controlled by professionals. At the same time, a special distribution box is set up. Random connection and pulling are strictly prohibited. The power distribution delisting mechanism is selected, especially to prevent illegal operations and prevent personal safety, wiring, and machinery. The occurrence of equipment safety accidents.
7. Electric tools such as electric drills, electric hammers, welding machines, etc. must have leakage protection equipment and good grounding protection wires. All electric tools and cables must be checked regularly to ensure good insulation. When using electric tools, Wear insulated safety shoes and insulated gloves.
8. The indoor lighting for the construction of the tower clock must use a working voltage within 36 volts. When all electrical equipment is not in use, the power supply must be cut off at any time and anywhere to prevent damage to the machinery and equipment.